Return to site

Wheatland ca hard rock casino

broken image
broken image

The WWTP consists of two separate MBR trains with a common anoxic and preair basin.

broken image

The wastewater system is an Ovivo MicroBlox MBR and has a design flow of 140K/day. The wastewater plant consists of the following components: In addition, there is a high flow pump system for supplying fire suppression. The finished potable water is delivered to the casino via a series of low-pressure high flow pumps. There is the ability for additional disinfection into the potable water system prior to delivery, should it be required. Raw well water is disinfected prior to entering the onsite reservoir. The potable water system for HRHCSFM Casino operates in the following manner. The Hard Rock Water and Wastewater project incorporates the following components: This casino has a 170-room hotel and over 1899 gaming machines and tables.

broken image

The casino is operated by Hard Rock International on behalf of the Estom Yumeka Maidu Tribe of the Enterprise Rancheria. Aquality Water Management (AWM) have been associated with this project since its inception of around seven years ago. Hard Rock Hotel and Casino Sacramento at Fire Mountain project is in Wheatland, CA.

broken image